Commercial HVAC & RTU Replacement in Colorado
Denver’s Green Buildings Ordinance and severe Front Range hailstorms drive high demand for fleeceback TPO/PVC and high-efficiency RTUs.
Compare Commercial HVAC Bids in Colorado
Get 3 itemized B2B proposals from licensed, $2M+ insured mechanical contractors (crane lift & permits included).
Commercial RFP Matched!
We are matching your facility in Colorado with licensed commercial contractors for itemized proposals.
#B2B-MATCHED Colorado Commercial HVAC Cost & System Comparison
| Commercial Scope | Est. Colorado Budget | Typical Lead / Install | Best Facility Fit |
|---|---|---|---|
| Packaged RTU Swap (5–15 Tons) | $12,500 – $38,000 | 1 Day Crane Lift | Retail strips, restaurants & small offices |
| Large RTU Fleet (20–50+ Tons) | $45,000 – $140,000+ | 1 – 3 Days | Warehouses, big-box retail & schools |
| VRF / Heat Recovery Retrofit | $3,200 – $4,800 / Ton | 1 – 3 Weeks | Multi-zone medical & office buildings |
| Quarterly PM Service Contract | $495 – $925 / yr | Scheduled Off-Hours | All commercial properties (cuts breakdowns 50%+) |
Major Colorado Commercial HVAC Metro Hubs
Colorado Commercial HVAC Bid & Section 179 Checklist
Every apples-to-apples Colorado commercial RTU proposal should itemize tonnage and SEER2/IEER efficiency ratings, crane rigging and weekend lift scheduling, curb adapter and economizer integration, haul-away of old units, and a $2M+ Certificate of Insurance.
Colorado Commercial HVAC FAQs
How much does a commercial RTU replacement cost in Colorado in 2026?
Across Colorado, turnkey packaged Rooftop Unit (RTU) replacements average $2,350 – $3,000 / Ton including crane rigging, curb adapters, economizers, and startup commissioning.
Are commercial HVAC replacements in Colorado eligible for Section 179?
Yes. Under IRS Section 179, qualified nonresidential HVAC equipment (RTUs, chillers, VRF systems, and controls) placed in service can often be expensed in Year 1 rather than depreciated over 39 years (confirm with your CPA).
What should a Colorado commercial HVAC PM contract include?
Quarterly or semi-annual Preventive Maintenance (PM) agreements should include coil chemical washing, belt/amp draw checks, economizer damper calibration, refrigerant subcooling logs, and priority 4-hour emergency dispatch.